Commit is a floor, not a ceiling
Working paper, September 2026, kept as published. The engagement it calls a dispatch audit has been replaced: see three ways to start.
The money worth optimizing in an AI compute fleet is not the money under contract. It is the overflow above it — and any tool that fails to make that distinction will be switched off by the buyer's own finance team.
There is a version of the compute-arbitrage pitch that dies in the first meeting with a FinOps lead, and it dies for a good reason. The pitch says: identical silicon is available elsewhere for half the price, so move the work and pocket the difference. The finance lead hears: you propose to route spend away from the contract on which our entire discount schedule depends, and to hand us a shortfall true-up at the end of the year.
They are right, and the failure is not one of nerve. It is arithmetic. An enterprise discount agreement or committed-use contract is a take-or-pay instrument. The buyer has already promised the money. Spending it elsewhere does not save it; it duplicates it. A saving that triggers a true-up is not a saving, it is a transfer with extra steps.
Where the addressable money actually sits
The interesting question is not whether to break the commitment. It is what happens above it.
Commitments are sized in advance, in a market that has been repeatedly wrong about its own trajectory. That produces error in both directions, and both directions matter.
Under-committed buyers overflow. Google Cloud's chief executive noted publicly in July 2026 that customers were spending on the order of 50% above their committed levels.
A correction we have had to make in public. An earlier version of this paper claimed that overflow is bought at on-demand list. That is wrong for most enterprise agreements, and a buyer caught it. Under a typical enterprise discount agreement or spend-based committed-use discount, spend above the committed floor still earns the negotiated rate, and in tiered structures overrun can pull you toward a better tier rather than a worse one. Your marginal rate on overflow is usually your negotiated rate, not list.
That matters because it shrinks the prize. If you assume the overflow is priced at list, you overstate the gross opportunity by roughly the size of the enterprise discount — which on a well-negotiated book is most of it. The remaining opportunity above the floor is real, but it is the gap between your negotiated rate and an independent supplier's delivered cost, not the gap between list and wholesale.
Over-committed buyers face the mirror image. Analysis of enterprise discount proposals has found them routinely padded 15–30% above realistic spend, on the reasonable commercial logic that a larger promise unlocks a larger headline discount. When the spend does not materialise, the shortfall is owed anyway.
The commitment is the floor. The floor is not the problem, and it is not the opportunity. The opportunity is the volatile, expensive, badly-priced tranche stacked on top of it.
This reframing changes what a dispatch system is for. It is not there to arbitrage everything. It is there to retire the floor first — deliberately, in the cheapest way that still counts toward the commitment — and then to price the overflow properly instead of letting it default to on-demand at the incumbent.
Why the overflow is structurally hard to contract for
A natural objection: if the overflow is predictable, commit to it too. Sign a second, larger contract and take a deeper discount.
The objection fails on the shape of the demand. Inference load is stochastic in a way that training was not. Reasoning-style models introduce order-of-magnitude variance in tokens generated per request, so the same nominal traffic can produce wildly different compute draw. Evaluation sweeps arrive in bursts tied to research calendars rather than to business seasonality. A fine-tune that fails its first run consumes twice what was budgeted, at no notice.
You cannot write a fixed-shape take-or-pay contract against a demand curve with that variance without either over-committing — and paying the shortfall — or under-committing and paying the spike. This is a well-understood problem in every commodity market that has faced it. Nobody contracts 100% of expected load at a fixed shape. They contract a baseload tranche and dispatch the rest.
The second reason is capacity, not price. Through 2026 hyperscalers repeatedly described themselves as capacity-constrained, with internal workloads prioritised ahead of external customers. In that regime, having a commitment does not guarantee you can consume it on the day you want to. The pain is availability as much as it is rate, and a second qualified supplier is insurance as much as it is arbitrage.
What this implies for a dispatch system
If the overflow is the target, several design consequences follow — and they are the opposite of what a naive cost optimizer does.
- Commitment retirement is a first-class objective, not a constraint to route around. The scheduler needs to know the commitment balance, the consumption pace required to retire it, and the remaining term. Work that can retire the floor should usually be placed on the floor even when a nominally cheaper supplier exists — but the reason matters, and it is easy to state wrongly. It is not that the capacity is free. A spend-based committed-use discount or savings plan is a promise to spend, billed at the discounted rate as you consume; the marginal cost of running on-plan is that discounted rate, not zero. Marginal cost is only genuinely zero on a prepaid capacity reservation you would otherwise forfeit. The correct comparison is therefore: independent supplier delivered cost, versus your discounted on-plan rate plus the expected shortfall penalty per dollar not consumed.
- The floor is denominated in dollars, and many things retire it. Most enterprise agreements let qualifying spend of almost any kind count toward the commitment — storage, egress, data services, managed databases — not just accelerator hours. That materially changes the dispatch problem: a buyer short on commitment consumption may be better served by moving a data-heavy workload onto the incumbent than by moving GPU hours, and an optimizer that only reasons about chip-hours will miss it.
- Concentration limits are a buyer policy, not a vendor default. The instinct to cap exposure at any one provider is sound for resilience and terrible for take-or-pay economics. A buyer mid-way through an under-consumed commitment may rationally want more concentration, not less. A system that imposes a house diversification rule is fighting its customer's balance sheet.
- The baseline is the blended effective rate. Not list price, and not the marginal on-demand rate either. The number that matters is what the fleet actually costs per chip-hour across everything — commitments, savings plans, private offers, spot, owned fleet. Savings claimed against anything else are not measurable against the invoice, which is where the argument eventually gets settled.
- Finance must be able to audit the stored baseline. The question "what would this have cost if we had simply run it at the incumbent" needs an answer per campaign, computed at the time of the decision and stored. Retrospective reconstruction is not persuasive to someone who suspects the number was chosen after the fact.
The framing that survives contact with finance
There is a version of this that a FinOps lead will support, and it sounds nothing like arbitrage.
It sounds like: your commitment is a floor you have already promised, so let us retire it deliberately rather than accidentally, using whatever qualifying spend retires it most cheaply. Above that floor you are buying at your negotiated rate from a vendor who is capacity-constrained and who may not have the capacity on the day. Let us price that tranche across the suppliers you have already qualified, place it where it clears on delivered cost, and reconcile the result to your invoice so the number is auditable rather than asserted.
That is not a threat to the discount schedule. It is a defense of it — because the fastest way to lose a discount tier is to under-consume, and the fastest way to blow a budget is to serve every spike at on-demand.
The uncomfortable corollary, which we would rather state than have discovered: for a buyer whose fleet sits entirely inside one under-consumed commitment, the correct advice is to consume the commitment and renegotiate at renewal. There is no dispatch problem to solve. An audit that returns that answer has done its job.
Sources: public remarks by Google Cloud leadership on customer consumption relative to commitments, July 2026; published analysis of enterprise discount agreement sizing practice; hyperscaler capacity commentary from Q2 2026 earnings calls. Figures describe market conditions as of Q3 2026 and are not forecasts.